Road Safety Works - Longden Road, Shrewsbury

News

Home » News » 2016 » 07 » 13 » Road Safety Works - Longden Road, Shrewsbury
Road Safety Works - Longden Road, Shrewsbury
13th July 2016

 

A safety scheme will be installed on Longden Road, Shrewsbury. The work aims to reduce the speed of traffic along the road and increase the safety of those who use the road, particularly those who use the adjacent school. Work is due to start on 15 August 2016 and last for three weeks.

Footway buildouts are proposed in four locations along Longden Road. Part time 20mph flashing signing will be installed on Longden Road and on Bank Farm Road. The road will be surface dressed from Stanley Lane to Roman Road and there will be changes to the existing traffic signs and road markings. The existing street lighting will also be upgraded.

When will the road be closed?

A Sunday closure (7am to 12noon) is proposed on 28 August to allow the road to be surface dressed.

A signed diversion route will be in place to accommodate this.

Access for residents will be maintained.

 

News

All the current local news from within the parish is located on the left.

Recent News

21st February 2024
Meeting at The Memorial Hall on April 16th 7.30pm. A group of Bayston Hill...
8th November 2023
Bayston Hill Parish Council have decided to create a Road Safety Working Group...
24th October 2023
Bayston Hill Parish Council in conjunction with the amazing volunteers from our...
27th September 2023
On Tuesday 17th October Keep Shropshire Warm will be hosting an energy advice...